Evaluation and Validation of the Causes for Cobblestone Road Failures in Hawassa City: Tigist Assefa¹*, Tigist Guracha, Erste Telila, and Temesgen Aynabeba. (2024). Ethiopian Journal of Engineering and Technology, 3, 15-25. https://doi.org/10.82127/x6wehw20